SAME DAY SHIPPING ON ORDERS PLACED BY 4 PM | 877-4-SPRUCE

Grumman AA1/A/B/C Spinner

$1125.00/Each
Part# 05-11283
MFR Model# TCB506006-502
DescriptionModelPN
Spinner DomeGrumman AA-1/A/B/C05-11283

Overview

These composite materials spinners and bulkheads are FAA/PMA approved and STCs to replace aluminum spinners and bulkheads on the Grumman aircraft models listed below. Bulkheads are constructed for maximum strength and resistance to fatigue due to vibration. Grummans metal versions often crack in 200-300 hours, whereas the composite assemblies have been tested over 4000 hours on a PA-28 with no failure. Spinners for twins & all bulkheads are warrantied against vibration fatigue for 5 years of the aircraft by the factory.

Includes Washers.
   
California Prop 65 Warning Symbol

WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov.

  • Customers Also Viewed
  • Related Items

Reviews

Q&A

Please note, Aircraft Spruce's personnel are not certified aircraft mechanics and can only provide general support and ideas, which should not be relied upon or implemented in lieu of consulting an A&P or other qualified technician. Aircraft Spruce assumes no responsibility or liability for any issue or problem which may arise from any repair, modification or other work done from this knowledge base. Any product eligibility information provided here is based on general application guides and we recommend always referring to your specific aircraft parts manual, the parts manufacturer or consulting with a qualified mechanic.

View in Catalog

View Image View in Catalog